Points West performed Construction Staking for reconstruction, realignment and widening of approximately 3 miles of Old Arcata Road. This included establishing a network of permanent control, verification of easement lines, isolated topographic surveys as needed for design issues that arose during construction, verification of plan grades, and preparation of cut sheets throughout the project. This project extended over two summers and required utilization of three crews to continually have staking ready for construction crews.